The contractor said the pool’s new blue liner peeled and tore because of “human oversight” and a flawed plan that involved layering two incompatible chemicals, documents show.
https://www.nytimes.com/2026/09/11/climate/reflecting-pool-contractor-trump.html
www.nytimes.com
